Additional 315mm chemical patching works

HTP Enviro Technical Service successfully carried out additional 315mm chemical patching works at Midtown DPC, as part of a maintenance and infrastructure reinforcement initiative. This specialized work aimed to address pipeline deterioration and leakage prevention within the drainage and utility system.

 

The scope involved identifying affected pipe sections, preparing the internal surface of the 315mm pipeline, and applying high-performance chemical patching materials to restore structural integrity and sealing performance. All works were executed using industry-grade compounds designed to withstand chemical exposure and environmental stress, ensuring long-term durability and functionality.

 

HTP Enviro Technical Service’s skilled team adhered to strict safety and quality protocols during the operation, minimizing disruption to ongoing site activities. The patching was completed within the scheduled timeframe, contributing to the overall efficiency and reliability of the pipeline network at Midtown DPC.

 

This project highlights HTP Enviro Technical Service’s expertise in delivering precise, technical repair solutions for critical underground infrastructure systems.

HTP Enviro Technical Project

Bitmap@4x (3)
Bitmap@4x (4)

Project Information

Client Name:
Belhasa Engineering & Contracting
Category:
Chemical Patching Works
Location:
Midtown DPC
create-an-illustration-of-a-smiling-indian-constru

Get best Consultancy

Need Help? Call Us Now
(+971) 4 257 7174