HTP Enviro Technical Service successfully completed drainage blockage removal works at four locations within Alserkal Avenue, Al Quoz, ensuring the efficient restoration of the drainage system and the prevention of waterlogging in the area. The blockages were primarily caused by debris accumulation, sludge buildup, and restricted flow in key pipeline sections across the identified sites.
Our team conducted site inspections to assess the severity and source of each blockage. Using a combination of high-pressure jetting, manual rodding, and suction techniques, the drainage lines were thoroughly cleaned and flushed to restore free-flowing conditions. All inspection chambers and connected gullies were also checked and cleared to ensure system-wide functionality.
The work was carried out efficiently across all four locations with minimal disruption to the surrounding commercial and creative spaces. This project showcases HTP Enviro Technical Service’s ability to deliver prompt, professional drainage solutions in busy urban environments with precision and care.
HTP Enviro Technical Project
