Interlock replacement,speed breaker installation

HTP Enviro Technical Service successfully carried out comprehensive interlock replacement and concrete speed breaker installation at South and North Core D3 in Midtown DPC. The project began with the removal of aged, uneven interlock pavers to create a stable base, followed by precise laying of new interlocks to restore a smooth, visually appealing pavementscape. Concurrently, concrete speed breakers were expertly installed at key access points to enhance traffic calming measures and improve pedestrian safety.

 

Throughout the process, the team ensured meticulous preparation of subgrade layers, accurate alignment of interlock patterns, and flawless concrete casting for the speed breakers—complete with defined edges and optimal height-to-width ratios. All work was executed with minimal disruption to site operations, strict adherence to safety protocols, and a focus on delivering durable, low-maintenance infrastructure solutions.

 

This project demonstrates HTP Enviro Technical Service’s commitment to elevating site access, enhancing safety, and maintaining aesthetic integrity in urban development environments.

HTP Enviro Technical Project

Bitmap@4x (27)
Bitmap@4x (28)

Project Information

Client Name:
Dubai Design District FZ LLC
Category:
Road Marking and Speed Humps
Location:
South and North Core D3
create-an-illustration-of-a-smiling-indian-constru

Get best Consultancy

Need Help? Call Us Now
(+971) 4 257 7174