HTP Enviro Technical Service successfully carried out the rectification of a 200mm irrigation pipeline at Dubai Investments Park 1 (DIP 1) to restore proper water flow and maintain efficient landscape irrigation. The rectification work was necessitated due to leakage and pressure drop issues caused by joint misalignment and minor pipe damage.
The scope included careful excavation of the affected section, inspection of pipeline integrity, replacement of damaged pipe fittings, and realignment of the 200mm line to ensure a secure, leak-free connection. After repairs, the line was pressure-tested and backfilled, followed by surface restoration to original condition.
This work was executed promptly with minimal disruption to surrounding areas, ensuring that the irrigation system returned to optimal performance. The project highlights HTP Enviro Technical Service’s expertise in underground utility maintenance and commitment to reliable, high-quality service delivery.