HTP Enviro Technical Service successfully carried out the rectification of interlock settlement and damaged traffic sign boards at Liwan Community, following structural impact and surface displacement caused by heavy rainfall. The project focused on restoring safety, functionality, and visual uniformity in affected areas of the community.

 

The interlock rectification involved carefully removing the sunken or uneven pavers, re-compacting and leveling the base layer, and reinstating the interlock with precise alignment to restore a smooth and even surface. At the same time, damaged and dislodged traffic sign boards were replaced or reinstalled with reinforced foundations to withstand future weather impacts.

 

All activities were completed in compliance with community safety standards and with minimal disturbance to residents. This project reflects HTP Enviro Technical Service’s prompt response capability and commitment to delivering durable infrastructure maintenance and repair services in residential developments.

HTP Enviro Technical Project

Bitmap@4x (19)
Bitmap@4x (20)

Project Information

Client Name:
Dubai Community Management
Category:
Interlock Rectification
Location:
Liwan Community
create-an-illustration-of-a-smiling-indian-constru

Get best Consultancy

Need Help? Call Us Now
(+971) 4 257 7174